Outlines several procedures and techniques, including routine inspections, rope cleaning techniques, rope replacement, and rope splicing. Stresses importance of approved procedures and techniques, and personal protective equipment.
•Describe the purpose of carrier ropes on a paper machine
•Identify the major components of a safe and efficient carrier rope system
•Describe routine inspections for a carrier rope system
•Describe the precautions and techniques for rope cleaning
•List in order the steps for rope replacement
•List in order the steps for putting a rope back on a sheave
•List in order the steps for dealing with sheave failure
•Describe some of the actions which should be performed on the system during a shutdown
Industrial Libraries
- Convergence Industrial Maintenance Library
- Convergence Paper Library
- Industrial Premium